Tanav K. - Ratings
Coaster | Manufacturer | Opened | Rating | Ridden at |
---|---|---|---|---|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 | 8/26/22 |
Coaster | Manufacturer | Opened | Rating | Ridden at |
---|---|---|---|---|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 | 8/26/22 |