Noel S. - Ratings
Coaster | Manufacturer | Opened | Rating | Ridden at |
---|---|---|---|---|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 | 8/10/21 | |
Wicked Twister
Cedar Point
|
Intamin | 2002 | 8/10/21 |