A Kenn - Ratings
Coaster | Manufacturer | Opened | Rating | Ridden at |
---|---|---|---|---|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 | 7/31/22 |
Coaster | Manufacturer | Opened | Rating | Ridden at |
---|---|---|---|---|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 | 7/31/22 |