Ratings • A Kenn
| Coaster | Manufacturer | Opened | Rating | Ridden at |
|---|---|---|---|---|
|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 |
|
7/31/22 |
| Coaster | Manufacturer | Opened | Rating | Ridden at |
|---|---|---|---|---|
|
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 |
|
7/31/22 |