Jim Billybob - Ratings
Coaster | Manufacturer | Opened | Rating | Ridden at |
---|---|---|---|---|
Carolina Cyclone
Carowinds
|
Arrow | 1980 | 10/6/24 | |
Copperhead Strike
Carowinds
|
Mack Rides | 2019 | 10/6/24 | |
Flying Cobras
Carowinds
|
Vekoma | 2009 | 10/6/24 | |
Maverick
Cedar Point
|
Intamin | 2007 | 8/7/24 | |
Steel Vengeance
Cedar Point
|
Rocky Mountain Construction | 2018 | 8/6/24 | |
Nighthawk
Carowinds
|
Vekoma | 2004 | - |