Ratings • Drew B
| Coaster | Manufacturer | Opened | Rating | Ridden at |
|---|---|---|---|---|
|
Gemini (Red)
Cedar Point
|
Arrow Dynamics | 1978 |
|
7/12/25 |
| Coaster | Manufacturer | Opened | Rating | Ridden at |
|---|---|---|---|---|
|
Gemini (Red)
Cedar Point
|
Arrow Dynamics | 1978 |
|
7/12/25 |